This Hydro power plant is constructed on Jehlum Lower Canal.
The main objective of Rasul Low Head Hydropower Project is to utilize the flows of Rivers Jhelum at Rasul Barrage to generate 20 MW power and supply into national grid system immediately. The project, falling in the load centre area will be connected to the nearest grid station and thus will contribute to the national grid with minimum line losses and no substantial cost for transmission line.
Wonderful and beautiful place for living and enjoy.